Over 1600m² of Ege Highline commercial carpet in three designs was used in the theatre auditorium, bar and circulation areas. Gradus nosings and trims completed the carpet installation by providing a very professional finish. Altro Stronghold was fitted to bar and WC areas. The main customer bar area was fitted with 120m² of Wicanders Cork tiles. 30m² of  Primary aluminium matting systems were installed at all customer entrances.